The Process

OUR BUILDING PROCESS

Building your first home can feel like a big step, especially if you’ve never been through the process before. Focused on ease and transparency, our dedicated and professional team guides you through every step of the build process. Whether this is your first experience with the exciting journey of building a home or something you’ve done before, we want to share with you what to expect during this process.Many of the people we work with are renters exploring the possibility of homeownership for the first time – including young professionals, families, mature renters and retirees. While some details can vary depending on the specifics of your house and land package, below is a step-by-step guide outlining our standard build process.

Stage 1

Pre-Construction

Approx. 7 to 8 months

This stage focuses on planning, approvals and preparing everything required before construction begins. There are a few steps to work through. These include:

  • Home design and cost estimate
  • Securing finance
  • Signing preliminary building documents
  • Paying deposits for both the house and land purchase
  • Securing land surveys and engineering reports
  • Formal finance approval
  • Settlement on the land purchase
  • Pre-start meeting to coordinate final requirements with council
  • Finalising the building contract and plans
  • Organising council approvals, certifications and building permits
  • Scheduling the build stages/trades/deliveries or similar

Generally, the above will take between 7 to 8 months to complete. Once finished, the building process can commence. While this list may look a little daunting, with our team on board, every detail is expertly handled on your behalf.

While you will be required to sign documentation and be involved with some aspects such as finance, the majority of the above is arranged and overseen by our experts. Ensuring a stress-free, streamlined and enjoyable build process is something we proudly excel at.

Stage 2

Construction

Approx. 7 to 8 months

Typically taking 7 to 8 months, our building and construction process is straightforward and designed to have you in your home as soon as possible.Once pre-construction is complete and approvals are finalised, your build moves through several clearly defined stages.

Site Works

Your land will be prepared for the build in advance of any construction. Typically this involves the site being cleared and levelled with drainage and footings also installed as needed. Main utilities connections such as gas and sewage will be arranged and related work for their safe use completed.Using your chosen floor plan as a guide and in line with how your home is to be oriented on the block, slab formwork for the next stage will also be built. This ensures everything is ready for the next stage to begin.

Slab Down

This stage sees the slab foundation for your home being poured. Made of concrete, this slab generally needs to be poured during dry weather and once completed, is left for several weeks to cure or harden, this ensures your home’s foundation is as strong as possible.

Framing & Plate Up

An exciting step in the build process, this stage involves framing out the walls, doors and windows of your home – the point where the structure really begins to take shape. Materials such as bricks, timber and/or steel will be delivered to the site ahead of time for this. Some framework may also arrive pre-assembled for faster installation.Upon completion of all the framework and with your home’s walls in place, your home will be considered as ‘Plate Up’ or ‘Plate High’. This means it is ready for the roof to be installed.

Roofing

Starting with the construction and installation of the roof frame, the roofing stage also sees all important downpipes and gutters installed. At the close of this stage, Colorbond or roofing tiles will be put in place as per your chosen home design materials.

Lock-Up

With your walls and roof in place, next up is the fitting of all windows and doors. A major achievement in any build, completion of this stage means you can now secure and lock-up your home. With the exterior now largely finished, it’s time to move indoors.

Internal Fit-out

At the start of your build, you will have been invited to meet with our interior designers and make some decisions regarding the inside of your home. This is when you select the fittings and fixtures for your home such as kitchen cabinetry, taps, tiles, flooring and other essentials like paint colours and more.Based on your choices and directives, our team of skilled tradespeople will now finalise the interior of your build. Starting with plastering and working progressively onwards from there, this is where your home truly comes to life.

Stage 3

Completion and Handover

Approx. 2 to 4 weeks

Practical Completion

At this point in the process, your home is almost ready for final inspection and handover. You can expect your home to have been professionally cleaned at this point, with all utilities and services connected and ready for use.At this time, you will be invited to give the home a final inspection – having a professional pre-handover report prepared by an independent building expert is also advised. This process provides you with an opportunity to note any concerns or defects and have them attended to and resolved before handover.Where remediation of any issues is required, a second, final inspection should be arranged to ensure this has been done as expected and agreed.

Handover

Today’s the day you receive the keys for your new home!In addition to the keys, you will also be provided with all relevant paperwork pertaining to the build. This usually includes things such as certificates of inspection, warranties for appliances/flooring or similar plus any documentation for connected services such as electricity, gas, water and sewerage.Congratulations! Your home-building journey is complete. You can now farewell renting forever, it’s time to move in and start enjoying your new home.

WHO WE HELP BECOME HOMEOWNERS

We help renters at different stages of life move into their own home, with guidance tailored to their situation.

Young Professionals

Paying high rent

Struggling to save a deposit

Want a realistic path to owning

Families

Need more space and stability

Want a backyard and good schools

Tired of rent increases

Mature Renters

Want to own before retirement

Unsure about finance options

Looking for certainty and guidance

Retirees

Want long-term housing security

Prefer low-maintenance homes

Want to avoid large, risky mortgages

Building With Stop Renting Perth

At Stop Renting Perth, we understand that building a new home over buying an established one can seem like a more complicated or potentially more stressful option. However, with our team on board, you can enjoy all the benefits of building with none of the hassle or stress. Our team coordinates the key stages of your build and works with experienced builders and trades to ensure your home is delivered to a high standard. We want you in your new home as quickly as possible – diligently working to avoid and overcome any delays to ensure this is achieved. Committed to providing a great experience from start to finish and upholding values of honesty and integrity, we’re the team you can trust to keep you informed and excited about your new home. If you’re currently renting and wondering whether building a home could be possible for you, our team can help you understand your options and explore the process step by step. Book an obligation-free consultation with Stop Renting Perth to learn more about the pathway toward homeownership.

FREQUENTLY ASKED QUESTIONS

Still have questions about building a home? Below are answers to some of the most common questions we hear from people currently renting.

How long does it take to build a home?

In many cases, the full process from selecting a house and land package through to handover takes around 14-16 months. This includes the pre-construction stage for finance approval, land settlement and council approvals, followed by the construction period.

Do I need to organise everything myself during the build?

No. While you will be involved in important decisions such as finance, design selections and final inspections, much of the coordination is handled by our team as we work with builders, trades and other professionals throughout the process.

Can first-home buyers build a home?

Yes. Many first-home buyers choose to build as house and land packages can provide an accessible entry point into the property market and the opportunity to purchase a modern home designed for current lifestyles.

What happens if issues are identified during the final inspection?

If any concerns or defects are identified during the final inspection, these can be noted and addressed before handover. Many buyers also choose to arrange an independent building inspection for additional peace of mind.

Can I choose the finishes and fittings in my home?

Yes. During the pre-start and interior selection stages you will be able to choose many of the finishes and fittings in your home, such as cabinetry, tapware, tiles, flooring and paint colours, depending on the builder and package inclusions.

Is building a home possible if I’m currently renting?

Yes. Many of the people we work with are currently renting and exploring whether homeownership may be achievable based on their circumstances. The first step is understanding your borrowing capacity and what options may be available.

Stop renting.
Start building your Perth home today.

Every month’s rent is money you could be tipping into your own bricks and mortar.
Let our team show you how much you qualify for today!

See if you qualify Home & land packages
  •   30+ Years Industry Experience
  •   Tailored Home Ownership Roadmap
  •   No-Obligation Information Sessions